context
stringlengths
154
175
question
stringclasses
4 values
answer
stringclasses
4 values
source
stringclasses
1 value
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 1)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 1)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 1)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 1)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 2)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 2)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 2)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 2)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 3)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 3)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 3)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 3)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 4)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 4)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 4)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 4)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 5)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 5)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 5)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 5)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 6)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 6)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 6)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 6)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 7)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 7)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 7)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 7)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 8)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 8)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 8)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 8)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 9)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 9)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 9)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 9)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 10)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 10)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 10)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 10)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 11)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 11)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 11)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 11)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 12)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 12)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 12)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 12)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 13)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 13)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 13)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 13)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 14)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 14)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 14)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 14)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 15)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 15)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 15)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 15)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 16)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 16)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 16)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 16)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 17)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 17)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 17)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 17)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 18)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 18)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 18)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 18)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 19)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 19)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 19)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 19)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 20)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 20)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 20)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 20)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 21)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 21)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 21)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 21)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 22)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 22)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 22)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 22)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 23)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 23)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 23)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 23)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 24)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 24)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 24)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 24)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf
AIIMS Delhi had budget allocations of ₹4489.67 crore (2023-24 actual), ₹4523.00 crore (2024-25 BE), ₹5000.00 crore (2024-25 RE), and ₹5200.00 crore (2025-26 BE). (Scenario 25)
What was the percentage change in AIIMS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((5200.00 - 4489.67)/4489.67)*100 = 15.8%.
sbe46.pdf
PGIMER Chandigarh had ₹2123.00 crore (2023-24 actual), ₹2200.00 crore (2024-25 BE), ₹2240.00 crore (2024-25 RE), and ₹2400.00 crore (2025-26 BE). (Scenario 25)
What was the percentage change in PGIMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((2400.00 - 2123.00)/2123.00)*100 = 13.0%.
sbe46.pdf
JIPMER Puducherry had ₹1307.00 crore (2023-24 actual), ₹1440.00 crore (2024-25 BE), ₹1370.00 crore (2024-25 RE), and ₹1450.00 crore (2025-26 BE). (Scenario 25)
What was the percentage change in JIPMER allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((1450.00 - 1307.00)/1307.00)*100 = 10.9%.
sbe46.pdf
NIMHANS Bangalore had ₹750.54 crore (2023-24 actual), ₹850.00 crore (2024-25 BE), ₹780.00 crore (2024-25 RE), and ₹860.00 crore (2025-26 BE). (Scenario 25)
What was the percentage change in NIMHANS allocation from 2023–24 actual to 2025–26 BE?
Percentage change = ((860.00 - 750.54)/750.54)*100 = 14.5%.
sbe46.pdf