Spaces:
Runtime error
A newer version of the Gradio SDK is available:
5.34.1
Unity Fleet - Executive Summary
Unity Fleet LLC is pleased to submit this proposal for the Illinois Department of Transportation's Statewide Planning and Research Funds grant to support the development of "The Link" - an innovative electric vehicle (EV) charging network that will transform transportation infrastructure across Illinois.
Project Overview
"The Link" represents a revolutionary approach to EV charging infrastructure, reimagining traditional charging stations as comprehensive destination hubs that integrate advanced charging capabilities with premium amenities to enhance the user experience. This project will establish a network of strategically located charging hubs across Illinois, with a particular focus on rural and underserved communities that currently lack adequate EV infrastructure.
Funding Request
Unity Fleet LLC is requesting $3,200,000 in IDOT Statewide Planning and Research Funds to support the planning, research, and development phases of "The Link" EV Charging Network. Unity Fleet has secured $3,800,000 in matching funds from private investors, corporate partners, and foundation grants, bringing the total project budget to $7,000,000.
Key Features and Components
Advanced Charging Infrastructure
- Multiple DC Fast Charging ports delivering 150kW capability
- Future-ready design to accommodate current and future heavy-duty vehicles
- Smart charging management system for optimal energy distribution
Solar Integration
- On-site solar generation with battery storage systems
- Truly emissions-free charging solutions
- Grid integration for energy stability and optimization
Premium Amenities
- Elevated lounge areas with refreshments, Wi-Fi, and productivity spaces
- Comfortable waiting environments that transform charging into a positive experience
- Community gathering spaces for events and education
Smart Technology
- AI-powered management systems for predictive maintenance and usage optimization
- Seamless mobile app integration for reservations, payments, and monitoring
- Data collection and analysis to inform future transportation planning
Subscription Services
Unity Fleet will offer innovative subscription models to increase EV accessibility:
FlexRide
- Starting at $299/month
- Access to shared EVs on a regular basis
- Includes insurance, maintenance, and priority charging
- Flexible booking through mobile app
Take-Home
- Starting at $699/month
- Exclusive access to a dedicated EV
- Multiple tiers with different mileage allowances
- All maintenance and charging included
All-Access
- Starting at $499/month
- Unlimited rides within designated areas
- Eliminates personal vehicle reliance
- 24/7 vehicle availability
Impact and Benefits
Environmental Impact
- 3-4 metric tons of CO2 reduced annually per EV
- 30% energy from on-site solar generation
- Over 1,500 metric tons of emissions avoided in Year 1
Economic Development
- 25+ direct jobs created in Year 1
- 70% procurement from Illinois-based suppliers
- $7.5M projected revenue by Year 5
- Revitalization of rural downtown areas around hub locations
Equity and Accessibility
- Community Access Program for low-income individuals
- Partnerships with social service organizations
- Targeted outreach to underserved communities
- ADA-compliant infrastructure exceeding minimum requirements
Rural Revitalization
- Strategic hub placement along key rural corridors
- Community partnerships with local businesses and municipalities
- Economic stimulus through job creation and increased visitors
- Connection of rural areas to the statewide clean transportation network
Implementation Timeline
Unity Fleet proposes a 15-month implementation timeline divided into three phases:
Planning & Design Phase (Months 1-3)
- Site selection and acquisition
- Permitting and regulatory compliance
- Community engagement and partnership development
- Detailed engineering and architectural design
Initial Deployment Phase (Months 4-9)
- Construction of first 3-5 Link hubs in strategic locations
- Development and testing of management software
- Training of initial staff and service providers
- Launch of pilot subscription services
Expansion Phase (Months 10-15)
- Construction of additional Link hubs
- Refinement of operational procedures
- Expansion of subscription services and fleet
- Implementation of community programs and partnerships
Alignment with IDOT Priorities
"The Link" EV Charging Network directly addresses IDOT's key priorities:
Transportation Innovation
- Advanced EV charging technology with future autonomous vehicle integration
- Smart grid integration for optimized charging
- Data collection infrastructure for transportation planning
- Connected vehicle technology support
Climate Action & Sustainability
- Significant greenhouse gas reduction through EV adoption
- Renewable energy integration with solar and battery storage
- Circular economy approach to construction and operations
- Quantifiable environmental benefits
Equity & Accessibility
- Geographic equity analysis for hub placement
- Workforce diversity plan for hiring and contracting
- Digital equity considerations for those without smartphones
- Transportation justice framework addressing historical inequities
Economic Development
- Workforce development pipeline with community colleges
- Small business incubation at hub locations
- Supply chain development for Illinois manufacturers
- Economic resilience for rural communities
Conclusion
"The Link" EV Charging Network represents a transformative opportunity to advance Illinois' transportation infrastructure while addressing critical environmental, economic, and equity challenges. By supporting this innovative project, IDOT will help position Illinois as a leader in clean transportation and rural economic development.
Unity Fleet LLC is committed to the successful implementation of this project and looks forward to partnering with IDOT to create lasting positive impact across Illinois communities.