Spaces:
Running
Running
## II. Origination Through Post-Closing/Endorsement
### C. Condominium Project Approval
#### 2. Project Eligibility
- A copy of the builder’s policy or the required documentation in Insurance Coverage;
- A CO or its equivalent; and
- Photographs of each building.
##### ii. Newly Converted
A Condominium Project is considered newly converted if the Date of Conversion is within 24 months of the time of Condominium Project submission.
**Date of Conversion** refers to the date that the legal documents were recorded. Newly converted Condominium Projects can only be processed under the HRAP option.
###### (A) Gut Rehabilitation Conversion
###### (1) Definition
Gut Rehabilitation (Gut Rehab) refers to the renovation of a Property down to the shell of the structure, including the replacement of all Heating, Ventilation and Air Conditioning (HVAC) and electrical components.
###### (2) Standard
Gut Rehabs must meet the general FHA Condominium Project approval requirements and New Construction standards.
###### (3) Required Documentation
The following documents must be submitted:
- Form HUD-9992;
- An engineering or architectural inspection, dated within 12 months, evidencing all rehabilitation work/repairs have been completed; and
- A CO or its equivalent.
###### (B) Non-Gut Rehabilitation
###### (1) Definition
Non-Gut Rehabilitation (Non-Gut Rehab) refers to rehabilitation work that is not structural and is limited to minor property repairs and improvements.
###### (2) Standards
Non-Gut Rehabs must meet the standards for Existing Construction.
---
**Handbook 4000.1 808**
**Last Revised: 01/10/2025**